Dune Resilience Project

The Story so Far

A pilot dune resilience project on Nairn Central Beach from Aug-Dec 2025 was funded by a small £8775 grant from the Community Led Local Development Fund in partnership with Highlands and Islands Climate Hub. A part time project coordinator, experienced conservationist Mark Bradfield, was recruited to support local community volunteers to work with conservation bodies, supported by Highland Council Flood Team the Nairn Common Good Officer, and Nairn BID. The aim was to remove some scrub and invasive species and do some trial marram grass replanting along Nairn Central Beach on Common Good Land to strengthen and preserve the vulnerable dunes ecosystem. This was done to help enable this natural barrier to continue to protect Nairn Links and Fishertown from the impacts of high tides and storms caused by climate change.

A second grant of £21,110 was secured in late 2025 from the Nature Restoration Fund to continue this work till October 2026 and Mark Bradfield was rehired as part time coordinator

A further £10,000 was secured in June 2026 from Highlands and Islands Environment Foundation for the academic year 2026/27 for Dunes Education sessional support to reach out to schools and community groups and develop educational and public information materials on how dunes work and how they can be looked after and to promote learning exchange with other conservation projects in the area eg Lossie Dunes

Why are we doing this?

According to Highland Council’s Regional Coastal Change Adaptation Plan( see below) adopted by the Environment and Infrastructure committee in May 2025, a ‘scored’ assessment exercise has put Nairn at the top of a list of 29 high risk locations identified in Highland for coastal erosion and coast and river flooding. This makes Nairn an urgent priority for a ‘Local Coastal Change Adaptation Plan’ which the Council said in May 2025 – will be delivered ‘as and when resources are available’.

A 2023 Study was commissioned by Highland Council of Nairn’s Coastal vulnerability called ‘Dynamic Active Pathways'( see below) which identified Nairn Central Beach dunes particularly the end nearest to Marine Cottages (pictured below in Nov 25) as particularly vulnerable to erosion and requiring urgent action.

( Update July 2026 some work will be carried out by Highland Council in summer 2026 using Nairn Common Good Funds to repair some collapsing gabions behind the Splashpad/Strathnairn Cafe area )

The recent Nairn Flood Risk Appraisal Report published in 2025 (see link below) tells us that 770 local homes and businesses are right now at risk of river or coastal flooding ( about one fifth of the town) – yet no investment in flood defences is so far committed. The SEPA flood risk map is below. The ‘1 in 200 year’ tag means little in 2026 with global climate change impacts accelerating year on year, with at risk parts of UK and rest of world experiencing ‘once in a century’ floods and weather events every single year

Below you can also read the Highland Council’s latest Aug25 Climate Change Adaptation Strategy report. This does not include any information on specific practical solutions or public resources available for a high risk location like Nairn.

NICE continues to work proactively with our Council representatives and officers, community councils , local business groups and other local and national partners(eg Scottish Water) to push forward local collaborative action on a Sustainable Nairnshire Action Plan -to secure public investment in the Sustainable Future prioritised in Our Nairnshire Local Place Plan before it is too late and we have a serious and costly flood emergency on our hands.

Archive Pictures of Nairn Coastline

Some aerial pictures of Nairn from the early 1990’s were kindly shared at a 2025 Dune Resilience public event by Bob Gordon of Nairn Sailing Club – these have been digitised by a local photographer and are worth a look ( zoom in) to compare the dunes ecosystem – Some of the Central Beach dunes strip looks narrower than now but there is little evidence of the invasive species and trees which have taken over in some places and fragmented the protective dunes coastal ecosystem of Nairn Central Beach since the Highland Council took over from Nairn District Council in 1997

Key documents

Dune Resilience Project – 2026 Volunteer Workdays schedule

Dune Resilience Project FAQs Sept 25

Dune Resilience Pilot project Report Dec 25

Highland Council -2023 JBA consultants report -(Nairn Coastal) Dynamic Active Pathways

Nairn Flood Risk Appraisal Final Report 2025

Highland Council May 2025 E and I committee Regional Coastal Change Adaptation Plan which identifies Nairn as most ‘high risk’ location in Highland

Highland Council Aug 2025 Climate Change Committee- Climate Change Adaptation Strategy Report