Links Toilets designs on public view at Community Centre and online till 11 May. Still time to share your views.

A reminder that the Links Toilets architect’s 3 design options are still on show at Nairn Community and Arts Centre upstairs in the NICE office till next Monday -11 May

The consultation is also open online till next week.

Click on this link to see the design options and send back your preferences.

Alternatively if you have a smart phone you can also click on the QR code below to access the survey

The 3 detailed designs on display at the Centre are also linked below with floor and site plans

The floor plans are worth a closer look online as are hard to see on our display at the Centre

Please have a look and give your feedback so that the architect can refine the design and add extra features which you have asked for before we progress to the next(Planning) stage to get this important public and tourist facility upgraded

Links to designs and floor plans below

Option 1 (modular unit)

Option 2 (modular unit)

Option 3 (newbuild with community space)

Site Plan (Option 1 and 2)

Site Plan( Option 3 replace current block)

More information on what is planned for the new toilets is here

Nairn Links Toilets Frequently Asked Questions(FAQs)

ou can also point your phone at the QR code pasted below to respond to this consultation

3 thoughts on “Links Toilets designs on public view at Community Centre and online till 11 May. Still time to share your views.”

  1. I prefer the design number 1. The fun colors match the rest of the area and the liveliness of the links. The design is practical and won’t interfere with the surroundings, but I would prefer it to replace the current block so it doesn’t block the view.

  2. Im not really worried about what design just that the facility is avaliable for those that are in need of it

    • thanks for your interest and support Catherine – we are keen to progress this project but now need to get designs through planning stage and access funding for the build and agree a sustainable operating model with Highland Council,( since the community has made clear they want improved facilities) a lead body to to run it and ensure support of local groups businesses and community to keep facilities open

Leave a Reply

Your email address will not be published. Required fields are marked *